Data-Driven Process Optimization: How We Reduced Lead Time in Goods Receiving by Over 56%
In pharmaceutical logistics, speed and precision in goods receiving determine the efficiency of downstream processes. If you want to reduce turnaround time, you need one thing above all else: complete transparency into every minute of the process. At SK Pharma Logistics, we have fundamentally optimized our goods receiving process through digital time tracking and the implementation of daily shop floor meetings.
The Starting Point: Lack of Measurability in Incoming Goods
Before the optimization, we faced challenges in the receiving department that are common in our industry. Although the teams worked with great focus, we lacked a standardized, data-driven foundation for precise process control.
The actual processing time for individual goods receipts was not fully measurable. In addition, long processing times for receipt delayed the rapid availability of goods, and in the dynamic day-to-day business, there was no standardized tool for structured prioritization.
Our goal was to make the process—from unloading to delivery—measurable, to resolve bottlenecks immediately, and to actively involve the teams in process optimization at the logistics company.

Our Approach: Digital Database and Daily Shop Floor Management
To carry out well-founded optimizations, we first established a precise data foundation. The key innovation was the introduction of a new subprocess for digital time measurement:
- Digital Process Start: During unloading, we scan a QR code. This timestamp serves as the official start of processing.
- KPI Tracking: Since then, we have been accurately tracking the unloading time, the time the shipment is ready for pickup, and the total turnaround time (including the sensitive sample shipment for pharmaceutical products).
- Quantity Reconciliation: Every day, we compare the deliveries that were pre-registered with the actual goods received.

Structured Meetings in Day-to-Day Operations
This data is managed through newly introduced daily shop floor meetings held directly in the receiving area. Following a standardized format, the team reviews the previous day’s key metrics every morning and prioritizes the day’s tasks.
Employees document any process bottlenecks that arise or suggestions for improvement on so-called action cards. These issues are addressed and tracked over the long term in strict accordance with the PDCA cycle (Plan-Do-Check-Act). In addition, the topic of workplace safety (accidents and near-misses) is a fixed, indispensable part of every daily meeting.
Thanks to insights gained from shop floor management in the receiving department, processes were systematically optimized and efficiency was significantly improved. Throughput times were reduced by about 50%—meaning goods are now available for further processing much more quickly.
At the same time, employees’ sense of personal responsibility and involvement was noticeably strengthened, which sustainably increases the efficiency of the entire logistics chain.
Hendrik Schoo – Director Operations

Key Findings: Employees as the Most Important Drivers of Innovation
The implementation of shop floor management has shown us once again that the employees on the shop floor are the true experts in their field.
By fostering an open culture of feedback and error reporting, valuable insights from the field are directly incorporated into our standards. We have learned that clear, visual prioritization within the team is sufficient to significantly reduce processing times in the receiving department. Often, even small structural adjustments are enough to have a major impact.

The result: A more than 50 percent reduction in turnaround time in just three months
The combination of digital data collection and guided shop floor management yielded measurable results in a very short time. In a direct before-and-after comparison of our process data, we were able to drastically reduce the processing time per goods receipt:
- July 2025: 1.81 days per goods receipt
- October 2025: 0.79 days per goods receipt
This means a reduction in turnaround time of over 56% in just three months.
Thanks to this increase in efficiency, our customers benefit from significantly faster product availability and accelerated processing throughout the entire supply chain. At the same time, we have strengthened information flows across the entire company and noticeably increased the sense of ownership among our operational teams.
Conclusion and Outlook
Shop Floor Management in Logistics has established itself as a key control element at SK Pharma Logistics. It demonstrates that modern pharmaceutical logistics thrives on the intelligent integration of digital data and a strong team culture.